1. General Scope & Definitions
These Terms & Conditions apply to all engineering assessments, itemized quotations, material procurements, installations, commissioning protocols, and maintenance agreements entered into between SolidCore Technologies (Pvt) Ltd. ("SolidCore", "Contractor", "we") and the commercial customer ("Client", "Buyer").
No verbal understanding or informal representation shall alter these terms unless specifically formalized in a written Purchase Order (PO), Work Order (WO), or Service Level Agreement (SLA) duly executed by authorized signatories.
2. Engineering Surveys & Technical Feasibility
SolidCore provides technical site surveys across major urban centers (Karachi, Lahore, Islamabad/Rawalpindi, Faisalabad). Site survey execution is subject to the following prerequisites:
- Safe Site Access: The Client must grant unobstructed, safe physical access to server rooms, riser shafts, ceiling plenums, and electrical switchgear rooms during mutually scheduled survey windows.
- Escort & Approvals: The Client is responsible for securing landlord, security, or building management entry passes and safety work permits prior to engineer arrival.
- Accuracy of Preliminary Information: Floor plans, power single-line diagrams, and equipment load schedules provided prior to site verification are treated as preliminary indicators until physically audited by our technical staff.
3. Quotations & BOQ Validity Period
Commercial Validity: 15 Calendar Days
Because critical infrastructure hardware (including Schneider/APC UPS units, Fluke-certified copper/fiber cabling, Apollo/Hochiki fire panels, and Hikvision/Dahua enterprise surveillance cameras) relies on foreign currency exchange parity and international freight tariffs, standard commercial quotations remain valid for fifteen (15) calendar days from the date of issuance unless explicitly stated otherwise in writing.
Upon expiry of the 15-day window, SolidCore reserves the right to re-validate equipment pricing against prevailing exchange rates prior to purchase order counter-acceptance.
4. Execution Standards & Handover Dossier Acceptance
All installations are executed in compliance with internationally accepted engineering codes (ANSI/TIA-568/606, NFPA 72/2001, IEEE 1100, and ASHRAE TC 9.9 guidelines). Handover and acceptance adhere strictly to our 6-Stage Delivery Methodology:
- Witnessed Testing: Prior to formal handover, SolidCore conducts joint witness testing with the Client's designated IT or engineering representative. This includes copper/fiber channel Fluke test certification, fire loop aerosol testing, sounder dBA audibility checks, and UPS battery load transfer tests.
- Handover Dossier: SolidCore delivers a comprehensive Handover Dossier containing CAD as-built floor schematics, certified test logs, asset warranty certificates, and Operation & Maintenance (O&M) manuals.
- Substantial Completion: Upon successful completion of witness testing and delivery of the test logs, the Client shall issue a formal Provisional Acceptance Certificate (PAC) or sign the Handover Protocol. Minor punch-list items that do not compromise facility safety or operations shall not delay substantial completion sign-off.
5. Warranty & Liability Framework
- Workmanship Warranty: SolidCore provides a standard twelve (12) month workmanship warranty covering installation labor, termination integrity, and panel interconnects from the date of Handover sign-off.
- OEM Hardware Warranties: Equipment warranties (e.g., UPS electronics, camera optics, sensor components) are backed directly by the respective Original Equipment Manufacturers (typically 1 to 3 years). SolidCore acts as the authorized liaison for RMA replacement during the warranty period.
- Exclusions: Warranties do not cover damage resulting from unauthorized third-party tampering, mains voltage surges outside nominal tolerance (in the absence of an isolated power conditioner), civil water ingress, structural building collapse, or unauthorized modifications to cable terminations.
6. Annual Maintenance Contracts (AMC) & SLA Response Commitments
Clients engaged under SolidCore AMC plans receive scheduled quarterly preventive audits and emergency breakdown call-out support governed by published Service Level Agreements:
- Response Time Metrics: Response times denote the period between ticket receipt via our central support desk (support@solidcoretech.pk / helpline) and the physical or remote engagement of an engineer.
- Essential Tier: Next Business Day (NBD) on-site response.
- Professional Tier: ≤ 4 to 6 Hours on-site response within urban limits.
- Enterprise Tier: ≤ 2 Hours on-site emergency response 24/7/365 within primary metropolitan hubs.
- Takeover Audits: Before onboarding third-party legacy infrastructure into an active AMC, SolidCore conducts a mandatory Baseline Health Audit to document existing defects, obsolete battery strings, or substandard cabling. Existing defects must be rectified before full SLA coverage takes effect.
7. Payment Terms & Title of Goods
Standard payment terms for turnkey contracts require mobilization advance against bank guarantee/corporate PO, progress milestones upon verified delivery of equipment to site, and final retention release upon Handover Dossier acceptance. Legal title to all supplied materials remains with SolidCore Technologies until full commercial settlement has been received.
8. Governing Law & Dispute Resolution
These terms and any resulting commercial contracts shall be interpreted, governed, and enforced under the laws of the Islamic Republic of Pakistan. Any dispute arising out of or in connection with these agreements that cannot be resolved amicably through senior executive consultation within thirty (30) days shall be referred to arbitration in Karachi under the Arbitration Act, 1940.
Legal & Commercial Contracts Desk
SolidCore Technologies (Pvt) Ltd. — SECP Registered Entity
Corporate Inquiries: info@solidcoretech.pk
National Headquarters: Karachi, Sindh, Pakistan | Phone: +92 21 3889 7650