DELIVERY DISCIPLINE

From Site Assessment to Signed Handover

Buyers do not buy equipment — they buy delivery discipline. Here is exactly how SolidCore Technologies manages every stage of your physical infrastructure deployment.

01
STAGE 1 · SITE ASSESSMENT

Comprehensive Engineering Site Survey

We never quote off a generic email or a hasty phone call. Our field survey engineers inspect your physical premises in Karachi, Lahore, or the Twin Cities to capture real-world constraints:

  • Physical room dimensions, ceiling heights, and floor loading capacity.
  • Main DB power availability, neutral-earth voltage, and generator changeover tie-ins.
  • Cable tray pathways, riser shaft space, and fire barrier wall penetrations.
  • Camera viewing angles, ambient lighting ranges, and blind spot identification.
Stage 1 Output: Completed Site Survey Protocol & Photographic Log
02
STAGE 2 · ENGINEERING & BOQ

Calculated Design & Itemized BOQ

Our design team converts survey measurements into engineered schematics and calculations:

  • UPS & Power: Active IT load calculations (kW), apparent power (kVA), battery string backup runtime modeling, and distribution branch breaker sizing.
  • CCTV: Sensor resolution, lens focal lengths, bit-rate modeling per H.265/smart codecs, and storage retention calculations (30/60/90 days).
  • Fire Protection: Enclosure volume calculations and clean-agent concentration design per NFPA 2001 (in collaboration with our certified suppression partner).
  • Transparent BOQ: Itemized line-by-line pricing with clear brand models and quantities. Delivered within 5 working days.
Stage 2 Output: Design Layout Schematic + Itemized Technical Proposal
03
STAGE 3 · PRE-EXECUTION

Procurement & Material Submittal

To prevent counterfeit hardware, all components are sourced through verified distributor channels. Before equipment is dispatched to your site:

  • We submit formal Material Technical Data Sheets for your approval.
  • Manufacturer serial numbers, batch numbers, and warranty certificates are recorded.
  • A Gantt chart project execution plan is agreed to align with your facility downtime windows.
Stage 3 Output: Approved Material Submittal Binder & Work Schedule
04
STAGE 4 · EXECUTION

Installation & Structured Integration

Our dedicated field teams install the physical infrastructure according to recognized standards:

  • Cabling: TIA-568 compliance for bend radius, pull tension, and separation from EMI high-voltage sources.
  • Labeling: TIA-606 alphanumeric labeling at both ends of every cable, patch panel port, faceplate, and breaker.
  • Cabinet Dressing: Horizontal and vertical cable management with neat hook-and-loop ties (no zip-ties crushing cables).
  • Fire Loop Wiring: Dedicated fire-rated cables, isolator modules per zone, and interface relays to AC trips.
Stage 4 Output: Physical Works Milestone Sign-off
05
STAGE 5 · QA & COMMISSIONING

Witnessed Testing & Commissioning Protocols

We do not declare a project finished until your technical team witnesses and signs off on every functional test:

  • Fluke Certification: 100% of copper and fiber links tested with calibrated Fluke analyzers (NEXT, Return Loss, Length).
  • UPS 72-Hour Burn-in: Simulated power outage transition, battery discharge runtime verification under load, and phase balance checks.
  • CCTV Hardening: Password complexity, default account deactivation, VLAN separation, and night-vision IR clarity test.
  • Fire Alarms: Loop test on every addressable sensor, sounder decibel verification, and door access fail-safe trip test.
Stage 5 Output: Witnessed Commissioning Sign-Off Protocol
06
STAGE 6 · HANDOVER & AMC

Commissioning Dossier Handover & Ongoing AMC

Your facility is handed over with the complete engineering documentation binder:

  • Full CAD as-built drawings and single-line power diagrams (SLD).
  • Bound Fluke certification pass reports for internal IT audit records.
  • Operation & Maintenance manuals, emergency contact cards, and admin training.
  • Activation of your SLA maintenance contract with scheduled preventive visits.
Stage 6 Output: Final Commissioning Dossier Binder & AMC Activation

SolidCore vs. The Generic Pakistani Contractor

Delivery Dimension Typical Market Contractor SolidCore Technologies
Site Assessment Hasty eyeball check or quotes blindly off phone
BOQ Transparency Lump-sum line items with hidden extras
Cabling Standards Unlabelled, non-standard wiring; no test reports
System Commissioning Leaves once power turns on; zero soak testing
Project Handover A simple invoice and keys
Post-Install Maintenance Unanswered phone calls when systems fail

Experience Process-Driven Infrastructure Delivery

Book a site survey with our engineers in Karachi, Lahore, Islamabad, Rawalpindi, or Faisalabad.